1. Accessing the System

1.1 Accessing iSQMT

iSQMT system can be accessed through this link in any browser.

1.2 User Account

ZBS user suppose to be in an Standard editing, library and Standards information division. Also user account suppose to have the following permissions in the system.

Figure 1.1: System permissions for user to access and configure standard

1.3 Login to the System

In successfully accessing the provided link, user will be landed to the login page as shown on figure 1.2 where the registered user will fill their username/email and password to login.

Figure 1.2: User login interface

Upon successful login user will be redirected to the home page where management of different activities is being done. Here user can see application requests, tasks, and make different activities.

Figure 1.3: Home page

2. Configuring Standard

2.1 Configure New Standard

To access standards user should click on "Standards" from the list of menus as shown on the figure 2.1 below. Upon clicking "Standards" user will be landed to the page containing list of standards (If any).To create a new standard click "Configure" as shown on the figure 2.2.

Figure 2.1
Figure 2.1: Accessing Standards
Figure 2.2: Configuring a new standard

Fill the details of the standard as required, insert or drag and drop the standard document if any and upload, then click "Create" to save and create the standard.( See figure 2.3 below)

Figure 2.3: Configuring standard

2.2 Requirements

To access requirements of the standard created click "Requirement"

Figure 2.4 (a): Accessing Requirements


You will be landed on the page of requirements and click "Create" to start adding the requirements.

Figure 2.4 (b): Creating a requirement


Fill the standard requirement's details accordingly and click "Create" to save details as shown in a figure 2.5 below.

Figure 2.5: Fill the details for standard requirements.

2.3 Observation

From the list of requirement, click on the intended requirement to which you want to add observation. Also you can access this by clicking on the eye button as shown on figure 2.6 (a) below.

Figure 2.6 (a) Accessing observations

Click on "Observation" to access list of observation as shown on the figure 2.6 (b) below

Figure 2.6 (b): Accessing observations

To add observation click on the button "Add"

Figure 2.7: Add an observation to requirement

Fill in the required details and click "Create" to save the details.

Figure 2.8: Fill observation details

2.4 Test Method

3. Management of Existing Standard

3.1 View existing standard

3.2 Edit Standard (Requirements, Observation, Test method)